INDUSTRIES · RAIL

The work block is here. The crossing approval isn’t.

Track time beside a live railway is booked months ahead. REALMS shows which approvals will not be there when it comes.

Illustrative chart: four items are ready before the work block; crossing approval is late.Illustrative chart: four items are ready before the work block; crossing approval is late.
A BAD DAY ON A RAIL PROJECT

Everyone knew something. Nobody knew all of it.

Illustrative scenario.

01

Three weeks before

The permitting lead knows the road authority has not signed the crossing agreement. It is a line in an email thread.

02

The night of the work block

The crew, the flagging and the equipment are booked. The schedule says the crossing is ready.

03

The morning after

The block is spent and the crossing is untouched. The next one is weeks out.

WHAT IT COST

One late answer, paid for four ways.

The later you find out, the more it costs.

Three weeks early

A phone call and a change of sequence.

The week before

A scramble, and favours called in.

On the day

A crew and its equipment standing by.

After

The window, the relationship, and the argument about whose fault it was.

Schedule

Days lost first, then the window that was behind them.

Money

A crew and its equipment on standby. You know what a day of that costs you.

Reputation

With the contractor, the people whose land it is, and the board.

Approvals

Rushed work is how conditions get missed and approvals get put at risk.

WHY IT KEEPS HAPPENING

The information existed. It was in different hands.

The people working the approval knew

It was a line in a tracker built for their own team.

Construction had the schedule

Built from planned dates, not from what was cleared on the ground.

Nobody had both

No single record tied the crossing agreement to the work block that depended on it.

WHO KNOWS

Land

Its own tracker, kept up to date.

Regulatory & permitting

Crossing agreement: not signed.

Environment

Its own tracker, kept up to date.

Engineering & utilities

Its own tracker, kept up to date.

THE GAP

Nothing ties an approval to the ground it holds up.

WHO BUILDS

Planning

Builds the schedule from planned dates.

Construction

Mobilizes against the schedule.

Crews in the field

Find out when they get there.

THE SAME DAY, WITH REALMS

Same project. Same problem. Known three weeks earlier.

01

Three weeks before

The crossing shows as Forecast Late. The package it belongs to turns with it.

02

The decision

The project team sees it while there is time to escalate with the road authority, or to plan other work for the block.

03

The night of the work block

The block is used. Nothing that was booked is wasted.

WHO KNOWS

Land

Its status lands on the location.

Regulatory & permitting

Crossing agreement: Forecast Late.

Environment

Its status lands on the location.

Engineering & utilities

Its status lands on the location.

ONE RECORD

Every approval tied to the ground it holds.

WHO BUILDS

Planning

Schedules the ground that is clear.

Construction

Moves crews to work that is ready.

Crews in the field

See what they can work today.

WHAT EACH LEADER GETS

One record. A different answer for each person who is accountable.

Executives

One readiness answer for the corridor, the reason behind it, and what is forecast to be late.

Construction managers

Which packages can go this week, and what is holding the rest.

Land & permitting leads

Every approval with an owner, a next step and a date, and a record of what was waiting on whom.

Project controls

A forecast date for every location, and a record of when each one was released to construction.

Indigenous & stakeholder relations

Every commitment on the ground it applies to, where crews will see it.

FOR IT

Built to sit inside your environment.

Your cloud or ours

Run REALMS in your own Azure tenant, or have us host it.

Your sign-in

Staff sign in with their Microsoft 365 accounts. No new passwords.

Your documents

Documents stay in your SharePoint.

Your data

A standard PostgreSQL database, open to your reporting tools through SQL or the REALMS API.

Your maps

Your ArcGIS layers on the same map as the project.

See REALMS on your corridor.

Bring the work block you are most worried about. We will show you what it depends on.