The outage is booked. One access trail isn’t cleared.
An outage window takes months to get and hours to lose. REALMS shows which structures are not ready while there is still time to do something about it.
Everyone knew something. Nobody knew all of it.
Illustrative scenario.
Three weeks before
The land agent knows one landowner has not signed for the access trail to three structures. It is a row in her spreadsheet.
The week of the outage
Crews and equipment are staged. The schedule says the structures are ready.
The day
The crew cannot reach the structures. The outage runs out with the work undone, and the next window is months away.
One late answer, paid for four ways.
The later you find out, the more it costs.
Three weeks early
A phone call and a change of sequence.
The week before
A scramble, and favours called in.
On the day
A crew and its equipment standing by.
After
The window, the relationship, and the argument about whose fault it was.
Schedule
Days lost first, then the window that was behind them.
Money
A crew and its equipment on standby. You know what a day of that costs you.
Reputation
With the contractor, the people whose land it is, and the board.
Approvals
Rushed work is how conditions get missed and approvals get put at risk.
The information existed. It was in different hands.
The people working the approval knew
It was a line in a tracker built for their own team.
Construction had the schedule
Built from planned dates, not from what was cleared on the ground.
Nobody had both
No single record tied the access agreement to the structures the crew was about to work.
Land
Access trail agreement: not signed.
Regulatory & permitting
Its own tracker, kept up to date.
Environment
Its own tracker, kept up to date.
Engineering & utilities
Its own tracker, kept up to date.
Nothing ties an approval to the ground it holds up.
Planning
Builds the schedule from planned dates.
Construction
Mobilizes against the schedule.
Crews in the field
Find out when they get there.
Land
Access trail agreement: not signed.
Regulatory & permitting
Its own tracker, kept up to date.
Environment
Its own tracker, kept up to date.
Engineering & utilities
Its own tracker, kept up to date.
THE GAP
Nothing ties an approval to the ground it holds up.
Planning
Builds the schedule from planned dates.
Construction
Mobilizes against the schedule.
Crews in the field
Find out when they get there.
Same project. Same problem. Known three weeks earlier.
Three weeks before
The access trail shows as Forecast Late, and the three structures behind it turn with it.
The decision
The construction manager sees what is held and why. Land gets help with the agreement, or the work is re-sequenced inside the window.
The day
The outage is used for the work it was booked for.
Land
Access trail agreement: Forecast Late.
Regulatory & permitting
Its status lands on the location.
Environment
Its status lands on the location.
Engineering & utilities
Its status lands on the location.
Every approval tied to the ground it holds.
Planning
Schedules the ground that is clear.
Construction
Moves crews to work that is ready.
Crews in the field
See what they can work today.
Land
Access trail agreement: Forecast Late.
Regulatory & permitting
Its status lands on the location.
Environment
Its status lands on the location.
Engineering & utilities
Its status lands on the location.
ONE RECORD
Every approval tied to the ground it holds.
Planning
Schedules the ground that is clear.
Construction
Moves crews to work that is ready.
Crews in the field
See what they can work today.
One record. A different answer for each person who is accountable.
Executives
One readiness answer for the line, the reason behind it, and what is forecast to be late.
Construction managers
Which packages can go this week, and what is holding the rest.
Land & permitting leads
Every approval with an owner, a next step and a date, and a record of what was waiting on whom.
Project controls
A forecast date for every location, and a record of when each one was released to construction.
Indigenous & stakeholder relations
Every commitment on the ground it applies to, where crews will see it.
Built to sit inside your environment.
Your cloud or ours
Run REALMS in your own Azure tenant, or have us host it.
Your sign-in
Staff sign in with their Microsoft 365 accounts. No new passwords.
Your documents
Documents stay in your SharePoint.
Your data
A standard PostgreSQL database, open to your reporting tools through SQL or the REALMS API.
Your maps
Your ArcGIS layers on the same map as the project.
See REALMS on your line.
Bring the outage you are most worried about. We will show you what it depends on.